Case Studies & Projects

Temporary Climate Solutions

Controlling Climate in Yale University Art Gallery

Yale University Art Gallery’s $135 million restoration and expansion project included the full renovation of two historic structures — the 1928 Gothic-style Swartwout building and the 1866 Street Hall. Their careful conversion enlarged exhibition spaces, collection study rooms, and classroom facilities.

Temporary Climate Solutions

Kaiser Permanente Hospital Dehumidification

Polygon and the Contractor utilized a sheet metal ducting and stack system to deliver dehumidified air onto each floor of the Kaiser Permanente Hospital.

Temporary Climate Solutions

Generator Lay Up

A 1,200 Megawatt PWR in Burlington, Kansas regularly utilizes Polygon to provide temporary dehumidification to lay up their generators.

Temporary Climate Solutions

Temporary Cooling During a Retrofit

Polygon provided temporary cooling for the retrofit of #1 and #2 turbines on a 900 Megawatt BWR Plant. Heat build-up during these shutdowns can create schedule delays due to the acclimation period for workers (as required by heat stress safety procedures).

Temporary Climate Solutions

Petrochemical tank coating time cut in half

Houston Fuel Oil needed to meet a deadline to store incoming crude oil, their painting contractor was challenged to complete two tanks within 28 days, versus a normal 60-day schedule. This demanding schedule had to be met during a cool, rainy period, which was likely to create condensation on the work surface of the tank.